Sign In | Join Free | My xpandrally.com |
|
Brand Name : ShiTan
Model Number : ST-350
Certification : ISO
Place of Origin : China
MOQ : 1 set
Price : workable
Payment Terms : T/T, Western Union
Supply Ability : 2000 sets per year
Delivery Time : 10-15 days
Packaging Details : customized packed or normal packing
Drilling Rig Name : ST 350 Drilling Machine 92 kw Diesel Engine Pneumatic Borewell Machine
Hole Diameters : 105-350mm
Place Of Origin : China (Mainland)
Model Numbe(m) : ST-350
Drilling Depths : 350 meters
Color : Yellow,Red
OEM : Customized
Crawler : Steel Crawler
Truck Mounted : Optional
Tech Support : Video Support
400m Truck Mounted Deep Borehole Water Well Drilling Rig Machine
ST 350 Pneumatic Borewell Machine Descrption
The machine can do both air drilling (with air compressor) and water drilling (with mud pump).
The mutifunctional drill rig of geothemal well is an improved device. Equipped with the good brand diesel engine, the drill rig meets national standards for emissions and environment. Meanwhile, the hydraulic system, supporting configuration and appearance, etc. have been optimized, thus improving the performance and working efficiency. The double rotation motor increased the rotaty torque and revolving speed.
ST 350 Pneumatic Borewell Machine Technical Information
Drilling Rig Model | ST 350 Pneumatic Drilling Rig Machine |
Drilling depth | 350m |
Dia.hole | φ140 - 325mm |
Advance Length one time | 6.6m |
Working pressure | 1.7-3.3MPa |
Air consumption | 17-35m³/min |
Length of rod | 1.5m,2m,3m, 6m |
Dia. Of rod | φ89,φ102,φ114 |
Lifting power | 24T |
Rotation torque | 6200-85000N.m |
Rotation Speed | 55-115r/min |
Diesel Engine | Yuchai |
Engine Power | 92Kw/2200rpm |
Travelling speed | 0-2.5 Km/h |
Climb capacity | 30° |
Weight | 9000kgs |
Dimension | 5900x2000x2850mm |
Application | Complicated geological conditions: Rock, Mud, Sand etc. |
Pre drilling inspection
1. Check whether the oil level, coolant and hydraulic oil of the drilling rig are sufficient.
2. Check whether the connecting screws of each part of the drilling machine are fastened.
3. The oil mist shall be added in time according to the use condition (it is forbidden to use the secondary polluted oil).
4. Check whether the left and right chains work hard at the same time and adjust them consistently
![]() |
Truck Mounted 400m Deep Borehole Water Well Drilling Rig Machine Images |